RAMS vs a Generic Risk Assessment: Why Sites Reject the Wrong One

Short answer: a generic risk assessment and a RAMS document are not interchangeable, and site managers who accept a generic one from a contractor are storing up problems for themselves. A RAMS (Risk Assessment and Method Statement) sets out both the hazards on a specific job and the exact sequence of work used to control them. A generic risk assessment on its own only covers the first half, and most principal contractors will reject it outright.

Why a generic risk assessment gets bounced

Under the Construction (Design and Management) Regulations 2015 (CDM 2015), contractors have a duty to plan, manage and monitor construction work so it is carried out without risk to health and safety, so far as is reasonably practicable. A risk assessment produced for one job and reused across several sites, with the site name simply swapped out, does not meet that duty. It has not considered the actual access, the actual plant on site that day, or the actual sequence of trades working around each other. Site managers who see the same generic paperwork turning up week after week, with nothing site specific in it, are right to send it back.

What a proper RAMS actually adds

The method statement half is what generic risk assessments are missing. It describes step by step how the work will be carried out safely: the order of operations, the plant and equipment involved, who is doing what, and the specific controls in place at each stage. Combined with the risk assessment, this gives a principal contractor something they can actually check against what is happening on site, rather than a document that could apply to almost any job anywhere.

Where the legal duty comes from

Beyond CDM 2015, the Management of Health and Safety at Work Regulations 1999 require every employer to make a suitable and sufficient assessment of the risks to their employees while at work. Suitable and sufficient is doing a lot of work in that phrase, and the Health and Safety Executive has been clear for years that a copy paste risk assessment with no method statement behind it usually fails that test on a construction site, where the hazards change from job to job.

What sites actually check for

When a RAMS is submitted, most competent principal contractors and their site managers are checking for a handful of specific things: does it name the actual site and the actual task, does the method statement match what the risk assessment identifies as the main hazards, are the control measures specific rather than generic (suitable PPE will be worn tells them nothing on its own), and has it been signed off by someone competent to do so. A document missing any of these gets rejected, and the delay while a proper one is produced usually costs more than getting it right the first time.

What happens if you turn up without one

Turning up to start work without an accepted RAMS in place can mean the job is simply stopped until one is produced, which costs far more in lost time than getting it right beforehand. On larger sites with an appointed principal contractor, this is not usually negotiable, since letting uncontrolled work start would put their own CDM 2015 duties at risk too.

Getting it right the first time

If a risk assessment on its own has been rejected, the fix is not to staple on a generic method statement either. It needs to be written for that job, on that site, by someone who understands both the hazards and the sequence of work well enough to describe it properly, otherwise it just gets rejected again in a different form.

For a fuller breakdown of what the two parts of a RAMS document actually cover, this explanation of what a risk assessment and method statement actually is is worth a read, and if you are writing the method statement section yourself, this guide to what makes a method statement pass review covers the detail sites are actually checking for.

If you would rather not risk a RAMS bouncing back and delaying the start on site, a professionally written RAMS document for your specific job covers both halves properly from the start, built around the actual site and the actual sequence of work rather than a template.

Comments

Popular posts from this blog

CDM 2015 Duties Explained for Small Contractors

RAMS Explained: What a Risk Assessment and Method Statement Actually Is

HMO Fire Safety Requirements, Room by Room